Changing Requirements

 
When changing Material Requirements using this template it is recommended that we download the existing job first to ensure we are changing the most correct existing material requirements.
 
Once downloaded, we may make any changes required to the available fields outlined in the user form section.  Remember to populate the Upload Action field with ‘Change’ so the template knows to change the existing records.  We can use the combination of change material and add (another) material transactions in the same upload.
 
 
Once this is all done, we may process the upload in the same way as outlined in the section above.