AIW User Guide - EAM Work Management Loader

Material Requirement User Form

 
The Material Requirements form inserts detail about material requirements for the work order.
 
 
Below are mandatory fields on this user form:
 
       Item
       Quantity or Amount
       Required Quantity
       Date Required
 
Other optional fields on this form are:
 
       Supple
       Subinventory
       Locator
       MRP Net
       Comments
       Auto Request Material
 
Material Operation is a read only field.  It shows the parent operation number the material belongs to.  
 
One operation may have multiple materials.  To add multiple materials for the same operation, add a blank row below the respective operation number and when the material requirements user form is opened, it will populate the same operation number in the “Material Operation” field from the parent section it belongs to.
 
Item Description is a read only field and the value appear after the material is selected in the Item field.